Set of turn-adjusted arc suppression coil

Technical parameters:

  • Applicable voltage level: 6KV, 10KV, 35KV, 66KV
  • Rated frequency: 50Hz
  • Compensation regulation: presetting
  • The error of capacitance current measurement is less than 2%.
  • Adjustment series less than 25 level
  • When the single-phase earth fault occurs, the residual current is less than 5A.
  • Ground response time: less than 60 ms
  • The displacement voltage of the system is less than 15%.
  • The control method of earthing device is real-time on-line monitoring and automatic compensation.
BASIC INFO PACKAGING&SHIPPING OUR SERVICES(FAQ)
Working principle
When the power grid is in normal operation, the arc suppression coil microcomputer controller calculates the current of the capacitance to the ground under the current mode of the power grid through real-time measurement and calculation.

According to the minimum residual current value or detuning degree preset, the gear position of the arc suppression coil should be stopped is judged, and the controller controls the on-load voltage tap joint to adjust it to the current level.

The required compensation gear, after the occurrence of grounding fault, the residual current at the fault point can be limited to a set range, to play an effective arc extinguishing, to ensure the safety of the power supply system.

Performance characteristics
  • The compensation and adjustment mode of the complete set of turn-type arc-suppression coil is pre-regulation, that is, before the single-phase grounding, the arc-suppression coil has been adjusted to a better compensation state according to the system grid capacitive current, and its grounding compensation response time is the time of SCR short damping resistance, the response speed is fast, and the compensation effect is good.
  • The structure of iron core and coil has the advantages of long service life, non-linear harmonic interference, no noise, large capacity, simple structure, reliable operation, rich operation experience and large usage.
  • The device can be equipped with small current grounding line selection function, and the unique active power method, the standard comprehensive line selection method, the parallel middle resistance line selection method can be used in the grounding line selection, especially the parallel middle resistance line selection method, which is an effective and accurate line selection method at present. The accuracy of grounding selection is greatly improved.
The structure of the arc suppression coil 
Turn-regulated arc suppression coil is generally composed of grounding transformer, turn-regulated arc suppression coil body, on-load sectional switch, microcomputer controller, control panel, damping resistance box, current transformer, voltage transformer, lightning arrester, isolation knife gate and other parts.

 

Tell me your needs, I will provide you with a solution
Mob: +86 0 138-3227-7552 (Jack)
Mail: weifan-Jack@mfrdo.com
WhatsApp: +86 138-3227-7552(Jack) 
Leaving a message.(click)

Q1. Are you the manufacturer or trader?

A:WEIFAN is a leading & professional manufacturer located in hebei province of China.

Q2. What is your main markets?

A:Our main market is in home & a half in South-East Asia, Middle East,West-Africa, East-European countries & Some South America..etc

Q3. What is your delivery & after-sales serive?

A:The delivery is according to order qty, normally for containers order we need 1 month. Per each month 20 containers (20’ft or 40’ft)are no problem for us .

We can answer user’s question and solve their problem in 24 hrs per each day and give full technical support in time to all of our products.

Q4. What is your product warranty?

A:Firstly we have quality certificates like CCC, ISO9001..etc .We supply 18 months quality guarantee,during this period we supply free repair,maintenance and technical support.

Q5.Do you accept OEM and ODM?

A:Yes. Our R & D team owns latest technology ,can develop & produce products as customers’ drawing & under their brand

Q6. What is your payment terms?

  1. 30% T/T in advance as deposit ,balanced against the shipping documents
  2. irrevocable L/C at sight for order which amount is over 100 thousand USD
  3. for old business partner,we can negociate together for other special terms
  4. For samples, we accept T/T,Western union, moneygram, paypal..etc

Q7. What is your terms of packing?
A: Generally, our packing is wooden case or customized packaging according to customer needs.

Prev:
Next:
Contact Us